CCMC 13299-L
Listing · Amrize Building Envelope Canada dba Duro-Last, a Division of Amrize Canada Inc.
CCMC 13299-L
Listing
Amrize Building Envelope Canada dba Duro-Last, a Division of Amrize Canada Inc.
- Products
- Duro-Last® 50-Mil Membrane
- Duro-Last® 60-Mil Membrane
- Criteria
- CAN/CGSB-37.54-95, Type 4, Class B
- MasterFormat
- 07 50 00, 07 54 19
- Status
- In the registry
- Tracked since
- November 9, 2026
The NRC report is the authoritative copy, with the conditions and limitations of use.
Same criteria (9)
Records assessed to CAN/CGSB-37.54, any edition.
- CCMC 13293-L Tuff Industries Inc. · Tufdek™
- CCMC 13312-L Carlisle SynTec Canada · (50, 60, 80) Mil Sure-Flex PVC Membrane and 3 more
- CCMC 13574-L Mule-Hide Products Co. Inc. · Mule-Hide PVC Membrane
- CCMC 13680-L Protan AS Protan International Roofing · PROTAN SE1.8
- CCMC 14011-L Amrize Building Envelope Canada dba Duro-Last, a Division of Amrize Canada Inc. · Duro-Fleece
- CCMC 14012-L Amrize Building Envelope Canada dba Duro-Last, a Division of Amrize Canada Inc. · Duro-Tuff
- CCMC 14437-L Amrize Building Envelope Canada, a Division of Amrize Canada Inc. · Elevate PVC KEE Membrane and 3 more
- CCMC 14504-L Soprema Inc. · SENTINEL P150 and 1 more
History
- November 9, 2026 First seen in the registry
BCINs.ca has tracked the registry daily since November 9, 2026. "First seen" is when we first saw the record, not when CCMC issued it; the NRC report has the dates.
Using a CCMC-assessed product in Ontario. Since July 1, 2025, a product with a CCMC evaluation no longer needs a Minister's Ruling before it can be used in Ontario.¹ A CCMC assessment does not on its own mean a product meets the Building Code. An evaluation (numbers ending in R) is evidence you can give the chief building official or registered code agency to support using the product as an alternative solution.² A listing (ending in L) shows the product conforms to a standard named in the listing. Either way, the product has to be used within the conditions and limitations in the NRC report, and the building official decides whether it is acceptable for your project.